Lessons learned from Eglinton Crosstown West Extension tunnelling project

Infrastructure News

Lessons learned from Eglinton Crosstown West Extension tunnelling project
Eglinton Crosstown West ExtensionTunnelling ProjectP3 Conference
  • 📰 DCN_Canada
  • ⏱ Reading Time:
  • 41 sec. here
  • 7 min. at publisher
  • 📊 Quality Score:
  • News: 37%
  • Publisher: 74%

Members of the project team discuss the success factors and challenges faced during the Eglinton Crosstown West Extension advance tunnelling project at the P3 Conference in Toronto.

Members of the project team on the Eglinton Crosstown West Extension advance tunnelling project talked about lessons learned during a recent panel at the P3 Conference in Toronto. The conference was hosted by the Canadian Council for Public-Private Partnerships.

The use of the P3 model on transit projects has been scrutinized in the past few years, but in a session at the P3 conference in Toronto, the team working on the advance tunnelling for the Eglinton Crosstown West Extension talked about how the model can be successful. The session was billed Seeing the Light: Tunnelling Towards Success on the Eglinton Crosstown West Extension. According to the team, the elements that contributed to the success were the ambitious construction schedule, an accelerated design schedule, a collaborative and co-operative strategy among all parties and a series of incentives upon completion of major project milestones. “Schedule was the main challenge in this project,” said Jose Luis Arévalo, tunnels global lead at TYPSA. “This was a design-build-finance projec

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

DCN_Canada /  🏆 17. in CA

Eglinton Crosstown West Extension Tunnelling Project P3 Conference Success Factors Challenges

Canada Latest News, Canada Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

Indigenous Coalition Opposes Metrolinx's Proposal for Eglinton Crosstown West ExtensionIndigenous Coalition Opposes Metrolinx's Proposal for Eglinton Crosstown West ExtensionA proposal from Metrolinx for an Eglinton Crosstown West Extension (ECWE) rail line to run as an elevated section is receiving pushback from an Indigenous-led coalition. The $4.7 billion ECWE project will bring the LRT another 9.2 kilometres west along Eglinton Avenue West to Mississauga. It is expected to be completed in 2030-31. Metrolinx is pushing ahead with plans to build 1.5 kilometres of the Eglinton Crosstown West Extension (ECWE) as an elevated stretch through a sensitive wildlife corridor and ecosystem of urban forest in the Mount Dennis area in Toronto despite continued objections by an Indigenous-led coalition. The growing, nine-member coalition wants the project to be built underground or at-grade, which would save Metrolinx both time and money. However, the Crown agency indicates its preference is for the project to go ahead as planned
Read more »

Ontario may have to operate Eglinton Crosstown LRT amid Toronto’s financesOntario may have to operate Eglinton Crosstown LRT amid Toronto’s financesThe Doug Ford government is facing the possibility of having to operate two major transit lines in Toronto if no further funding arrangements can be made.
Read more »

Metrolinx shows off another Eglinton Crosstown station they won't let people useMetrolinx shows off another Eglinton Crosstown station they won't let people useToronto transit riders have been waiting a dozen years for the new Eglinton Crosstown LRT, and Metrolinx has still yet to provide the public with a...
Read more »

Province may have to run Eglinton LRT amid Toronto’s financial woesProvince may have to run Eglinton LRT amid Toronto’s financial woesNew documents suggest the Ford government could be forced to pay to operate the Eglinton Crosstown and Finch West LRTs after the city of Toronto paused some financial discussions.
Read more »

Ontario may have to operate 2 Toronto LRTs amid city budget crunch: documentsOntario may have to operate 2 Toronto LRTs amid city budget crunch: documentsAll major construction on the Finch West LRT is expected to be complete by the end of the year, while the Eglinton Crosstown is facing significant delays, with no confirmed opening date.
Read more »

Two men seriously injured in shooting at Eglinton East pubTwo men seriously injured in shooting at Eglinton East pubTwo men were taken to hospital following a shooting at a pub in the Eglington East area in Scarborough overnight.
Read more »



Render Time: 2025-02-15 14:34:09