Fuel leak ruins NASA’s second attempt at launching moon rocket

Canada News News

Fuel leak ruins NASA’s second attempt at launching moon rocket
Canada Latest News,Canada Headlines
  • 📰 chicagotribune
  • ⏱ Reading Time:
  • 44 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 21%
  • Publisher: 91%

NASA’s new moon rocket sprang another hazardous leak Saturday, delaying the launch for the second time this week.

An American flag flies in the breeze as NASA's new moon rocket sits on Launch Pad 39-B after being scrubbed at the Kennedy Space Center Saturday, Sept. 3, 2022, in Cape Canaveral, Fla.

The first attempt earlier in the week was also marred by escaping hydrogen, but those leaks were elsewhere on the 322-foot rocket, the most powerful ever built by NASA.There was no immediate word on when NASA might try again. After Tuesday, a two-week launch blackout period kicks in. Extensive fuel leak repairs could require that the rocket be hauled off the pad and back into its hangar, possibly pushing the flight into October.

After days of stormy weather, the weather cooperated early Saturday as the launch team began loading nearly 1 million gallons of fuel into the Space Launch System rocket. During Monday’s launch attempt, hydrogen fuel escaped from elsewhere in the rocket. Technicians tightened up the fittings over the past week, but Blackwell-Thompson cautioned that she wouldn’t know whether everything was tight until Saturday’s fueling.

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

chicagotribune /  🏆 8. in US

Canada Latest News, Canada Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

NASA orders five more astronaut missions from Musk's SpaceX in $1.4 bln dealNASA orders five more astronaut missions from Musk's SpaceX in $1.4 bln dealSpaceX will launch five more astronaut missions to the International Space Station for NASA at the end of the decade under a $1.4 billion contract order, the U.S. space agency said Wednesday, taking the company's total contracted missions for its Crew Dragon astronaut capsule to 14.
Read more »

NASA aims for Saturday launch of new moon rocket after fixesNASA aims for Saturday launch of new moon rocket after fixesNASA is counting down toward a Saturday launch of its new moon rocket, its second attempt in a week.
Read more »

NASA Aims For Saturday Launch Of New Moon RocketNASA Aims For Saturday Launch Of New Moon RocketThe inaugural flight of the 322-foot Artemis I rocket — the most powerful ever built by NASA — was delayed late in the countdown Monday.
Read more »

Here's What the Former Head of NASA Has to Say About the Moon Mission DelayHere's What the Former Head of NASA Has to Say About the Moon Mission DelayIn conversation with Futurism, a former NASA administrator discusses everything from the SLS to Russia to early meetings with Elon Musk.
Read more »

NASA aims for Saturday launch of new moon rocket after fixesNASA aims for Saturday launch of new moon rocket after fixesManagers say they've fixed the leaks and will work around the faulty sensor, in hopes of finally getting the test flight off.
Read more »



Render Time: 2025-02-27 18:07:47